On this page we present our results from HYPAT during the stages of the project.
The world maps shown in HYPAT Working Paper 03/2022 with the full load hours and electricity generation cost for wind, PV and CSP determined with the Enertile model within the HYPAT project are provided here in higher resolution. The maps are published under the license Creative Commons Attribution 4.0 International (CC-BY 4.0). They were created using the free and open source software QGIS. The shown results were generated using the global reanalysis ERA5 (hourly data on model levels, downloaded from the Copernicus Climate Change Service (C3S) Climate Data Store (CDS) API)."
19.07.2022
Full load
hours wind 2050
19.07.2022
Full load
hours PV 2050
19.07.2022
Full load
hours CSP 2050
19.07.2022
Electricity generation cost wind 2030 (2% WACC everywhere)
19.07.2022
Electricity
generation cost PV 2030 (2% WACC everywhere)
19.07.2022
Electricity generation cost CSP 2030 (2% WACC everywhere)
19.07.2022
Electricity generation cost wind 2030 (country-specific WACC)
19.07.2022
Electricity
generation cost PV 2030 (country-specific WACC)
19.07.2022
Electricity generation cost CSP 2030 (country-specific WACC)
19.07.2022
Electricity generation cost wind 2050 (2% WACC everywhere)
19.07.2022
Electricity
generation cost PV 2050 (2% WACC everywhere)
19.07.2022
Electricity generation cost CSP 2050 (2% WACC everywhere)
19.07.2022
Electricity generation cost wind 2050 (country-specific WACC)
19.07.2022
Electricity
generation cost PV 2050 (country-specific WACC)
19.07.2022
Electricity generation cost CSP 2050 (country-specific WACC)